logo
ProjectClosed

TxDOT: US 80 Interchange Improvements

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Interchange (New Or Reconstructed) Ih 635 At Us 80 Interchange Length: 1.9940 Miles, East Of Town, Us 80 East Blvd - East Of Belt Line Rd

Status
Closed
Sector
Commercial, Manufacturing (Industrial)
Location
Sunnyvale, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about TxDOT: US 80 Interchange Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “TxDOT: US 80 Interchange Improvements” is an infrastructure initiative in the Commercial sector, located in Sunnyvale, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Interchange (New Or Reconstructed) Ih 635 At Us 80 Interchange Length: 1.9940 Miles, East Of Town, Us 80 East Blvd - East Of Belt Line Rd

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Sunnyvale

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Manufacturing (Industrial)

Article published date

2024-06-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project