logo

TX/DOT:BU 287P Preventive Maintenance REBID

Sector: Manufacturing (Industrial) • Location: Fort Worth, Texas, United States of America

Source: Dodge

Project
Bid Results

BU 287P PREVENTIVE MAINTENANCE - TARRANT BU 287P TARRANT BU 287P 0172-01-055 F 2025(292) 0172-01-057 C 172-1-57 E ROSEDALE ST. MILLER AVE LENGTH: 0 MILES E BERRY ST PECOS ST LENGTH: MILES

Status
Closed
Sector
Manufacturing (Industrial), Commercial, Consumer Products
Location
Fort Worth, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about TX/DOT:BU 287P Preventive Maintenance REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “TX/DOT:BU 287P Preventive Maintenance REBID” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Fort Worth, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

BU 287P PREVENTIVE MAINTENANCE - TARRANT BU 287P TARRANT BU 287P 0172-01-055 F 2025(292) 0172-01-057 C 172-1-57 E ROSEDALE ST. MILLER AVE LENGTH: 0 MILES E BERRY ST PECOS ST LENGTH: MILES

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Fort Worth

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Commercial, Consumer Products

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project