Tychowo Wind Farm

Sector: Power Generation (CCGT) • Location: Poland

Source: European Bank for Reconstruction and Development (EBRD)

Project
Complete

The construction and operation of the 50MW Tychowo windfarm, located approximately 350km north-west of Warsaw, and close to the Baltic Sea shore. The project is to contribute to the development of renewable energy in Poland and substantially increase the Polish wind generation capacity that currently totals approx. 230MW. The project transition impact will derive from the following key areas: Glob

Project Information FAQ

Project Information

3 Q
The project “Tychowo Wind Farm” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Poland. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The construction and operation of the 50MW Tychowo windfarm, located approximately 350km north-west of Warsaw, and close to the Baltic Sea shore. The project is to contribute to the development of renewable energy in Poland and substantially increase the Polish wind generation capacity that currently totals approx. 230MW. The project transition impact will derive from the following key areas: Global Renewable Power International (“Global RPI”), the Sponsor of the Tychowo Windfarm project is the company co-owned by Minicentrales S.A. of Spain and Hydrocontracting GmbH of Austria, together, the international hydro and windfarm project developers and promoters. Global RPI is an active developer of the windfarm projects in Poland (in close cooperation with Polish developer Windpol), Croatia and Chile. The company has proven capabilities in green-field development, construction, operation and maintenance of renewable energy generating assets. EBRD is to provide up to EUR 30 million long-term debt financing package, consisting of senior and subordinated tranches. PLN 125.9 million Screening category and justification Following an Initial Environmental Examination (IEE), the project was screened as B/0. The construction and operation of a wind farm can be associated with a number of environmental and social issues that can be readily assessed as part of an environmental due diligence. The IEE and studies undertaken as part of the planning and building permits applications (including a Polish EIA and a one year bird survey) concluded that the project is not located in a sensitive environmental setting, therefore does not fall under Annex 1 of the Bank's Environmental Policy (2003) requirements. Due diligence undertaken and outcomes An environmental due diligence was undertaken of the Project by an independent international consultant, inclusive of site visit's and meetings with the local regulators, the developer and their technical and environmental advisors. The due diligence confirmed that the project location is not in a sensitive location and will not cause significant negative impacts to any Nartura 2000 sites or avifauna. The Sponsor has undertaken an Environmental Impact Assessment (EIA) as required by Polish environmental law and obtained relevant construction permits. The EIA has been undertaken in accordance to the Polish transposition of the EU EIA Directive, as amended. As part of the baseline assessment a year long bird survey was undertaken of the site and the EIA was subject to Polish public consultation requirements. The EIA process and scope of assessments was reviewed during the due diligence and deemed to meet the Bank's B level requirements. As part of the EIA process the developer has been required to reduce the number of wind turbines to 20 and specific bird monitoring requirements have been required by the local authorities. The monitoring will be undertaken over a 3 year period and includes both Annex 1 list of the Bird Directive, as well as local bat populations. Results are to be provided to the regulators on a six monthly basis. A non technical summary (NTS) of the local Environmental Impact Assessment (EIA) can be obtained in English (4MB - PDF) (Non Technical Summary) and in Polish (4MB - PDF) (Streszczenie Nie Techniczne Raportu Oddziaływania na Środowisko). A non technical summary is aso availbale on the Company web site (www.windpol.com) Implementation requirements The project company (i) will be required to provide the Bank with an annual environmental report, including updates on the bird monitoring undertaken, and notification on any material accidents or incidents, (ii) will conduct its business with due regard to National and EU environmental regulations and standards, and (iii) will arrange for periodic environmental audits and monitoring visits by Bank staff or appointed representatives, if and when deemed necessary. None. Mr. Gerhard Matzinger Hydrocontarcting Group Reisnerstraße 5/3/II A-1030 Vienna, Austria Tel: +43 1 7102118 Fax: +43 1 7102116 E-mail: matzinger@hydrocontractiong.at Mr. Krzysztof Piotrowiak Gigawatt Development Sp. z o. o. Al. Wojska Polskiego 70 70-479 Szczecin Tel:+48 914847582 Fax:+48 914841342 E-mail: krzysztof.piotrowiak@windpol.eu

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data