Tyler Median Infill and SoutHSide Parking Expansion Project
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge
The project includes: All materials, equipment, and labor required to complete the infilling of garden beds in select medians of Loop 323 with reinforced concrete, and the expansion of the handicap parking at Southside Park with reinforced concrete pavement. Removal of existing garden soil and plant life, and demolition of existing concrete pavement are required for construction of the project. Th
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Government, Road, Car parking, Automotive, Commercial, Hospital
- Location
- Tyler, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Tyler Median Infill and SoutHSide Parking Expansion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes: All materials, equipment, and labor required to complete the infilling of garden beds in select medians of Loop 323 with reinforced concrete, and the expansion of the handicap parking at Southside Park with reinforced concrete pavement. Removal of existing garden soil and plant life, and demolition of existing concrete pavement are required for construction of the project. The project requires traffic control, and it includes the relocation or capping of existing water s... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Tyler |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Road, Car parking, Automotive, Commercial, Hospital |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
