Tyne Valley Events Center Rebuild
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The Project consists of the reconstruction of the Tyne Valley Community Sports Centre, which was destroyed in a fire in December 2019, with a brand new, high-efficiency, fully energy-integrated arena. The arena will house an NHL-sized ice sheet (60.9m x 25.9m) and include five dressing rooms, fully accessible washrooms with green fixtures, concession area, fitness center, and multiple offices for
- Status
- Closed
- Sector
- Water Supply and Storage, Solar, Telecommunications, Commercial, Stadium, Broadband, Car parking, Government, Automotive
- Location
- Prince Edward Island, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Tyne Valley Events Center Rebuild
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of the reconstruction of the Tyne Valley Community Sports Centre, which was destroyed in a fire in December 2019, with a brand new, high-efficiency, fully energy-integrated arena. The arena will house an NHL-sized ice sheet (60.9m x 25.9m) and include five dressing rooms, fully accessible washrooms with green fixtures, concession area, fitness center, and multiple offices for community groups and event organization. The Project will also include the repaving of the existing 2700 m2 parking lot. An energy consultant will assist the design team in the carbon footprint reduction and in completing the Green Globes Evaluation, which is a green building assessment and certification program. The Reconstruction of this building will include specific green elements such as: 4th generation solar fiber optic lighting units, a rink floodwater treatment system, rink pump optimization equipment, water-water heat pump/heat recovery unit, energy efficient ice refrigeration system and piping, low emissivity ceiling and a magnetic bearing chiller and the purchase of a Zamboni. This Project will benefit the community of Tyne Valley by increasing the energy efficiency of the Tyne Community Sports Center, as measured against the original facility, which was recently destroyed by fire, and improve access to and increase the quality of its community, cultural and recreational infrastructure. |
Original sector | Community, Culture and Recreation |
Procurement method |
Location
Country | Canada |
State | Prince Edward Island |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Solar, Telecommunications, Commercial, Stadium, Broadband, Car parking, Government, Automotive |
Article published date | 2025-07-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
