TZ-Second Power and Gas Sector DPO
Sector: Bridge • Location: Tanzania
Source: World Bank Group
The Second Power and Gas Sector Development Policy Operation (PGSDPO-II) to the United Republic of Tanzania will be the second in a series of three annual programmatic development policy operations (DPOs). The operation is an International Development Association (IDA) credit for the amount of United States (U.S.) 100 million dollars. The program development objective (PDO) of the series is to: (i
- Status
- Closed
- Sector
- Bridge, Oil and Gas, Natural Gas, Power Generation (CCGT), Government
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about TZ-Second Power and Gas Sector DPO
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Second Power and Gas Sector Development Policy Operation (PGSDPO-II) to the United Republic of Tanzania will be the second in a series of three annual programmatic development policy operations (DPOs). The operation is an International Development Association (IDA) credit for the amount of United States (U.S.) 100 million dollars. The program development objective (PDO) of the series is to: (i) strengthen the countrys ability to bridge the financial gap in its power sector; (ii) reduce the cost of power supply and promote private sector participation in the power sector; and (iii) strengthen the policy and institutional framework for the management of the countrys natural gas resources. The Government of Tanzania (GoT) has begun implementing a strategy to bring the sector back to a financially sustainable path by enhancing revenues in the power sector in the short term and reducing the cost of electricity supply in the medium term. In the medium term, cost savings will be realized by shifting the power generation mix from liquid fuel-based technologies to natural gas-based power plants and other sources of cheaper and cleaner energy, with broader and competitive private sector participation. While some challenges remain, the GoT has taken vigorous efforts since the First Power and Gas Sector DPO (PGSDPO-I) was approved by the World Banks Board of Executive Directors on March 26, 2013. This DPO series helps the country reduce poverty and improve its shared prosperity by facilitating implementation of the Governments strategy in the power and gas sectors, which will help to increase access to electricity and private sector development. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Tanzania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Bridge, Oil and Gas, Natural Gas, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in Tanzania
- Dar es Salaam New Berths Vijibweni, Mbwamaji and Kunduchi
- Dar es Salaam Port Access Roads Development
- Malagarasi Bridge and Approach Roads
- Tanzania - Mnivata Newala Masasi (160 Km) Road Upgrading Project
- Pedestrian Bridge at KagondoKaifo Street
- Tanzanite Bridge Project
- JP Magufuli Bridge
- Tanzanian Railway Expansion
