TZO Influent Pump Replacement
Sector: Water Supply and Storage • Location: Greensboro, North Carolina, United States of America
Source: Dodge USA
The work in this contract is located at the Influent Pump Station and consists of replacement of existing vertical centrifugal pumps with extended shafts and variable frequency drives with new vertical turbine pumps with direct-coupled shafts and variable frequency drives; replacement of suction isolation valves and piping; installation of air relief valve discharge piping; architectural and struc
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Government, Wind
- Location
- Greensboro, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about TZO Influent Pump Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work in this contract is located at the Influent Pump Station and consists of replacement of existing vertical centrifugal pumps with extended shafts and variable frequency drives with new vertical turbine pumps with direct-coupled shafts and variable frequency drives; replacement of suction isolation valves and piping; installation of air relief valve discharge piping; architectural and structural improvements.. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Greensboro |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Government, Wind |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
