U of U Physical Medicine & Rehab Clinic Imaging Remodel
One of 10,000+ projects Taiyo tracks in Utah.
Source: Dodge USA
Bid Package #2 for about 5,800 sq/ft of space.There is also an infill portion with geofoam in the NW corner. Pay attention to the wall call outs that call our for lead line shielding and which walls those are called out on. There is a small classroom (Room 155) that needs to be completed by the first week of January (See schedule). This is to allow students to leave their current classroom, which
- Status
- Closed
- Sector
- Commercial, Hospital, Education, Hotel
- Location
- Salt Lake City, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about U of U Physical Medicine & Rehab Clinic Imaging Remodel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bid Package #2 for about 5,800 sq/ft of space.There is also an infill portion with geofoam in the NW corner. Pay attention to the wall call outs that call our for lead line shielding and which walls those are called out on. There is a small classroom (Room 155) that needs to be completed by the first week of January (See schedule). This is to allow students to leave their current classroom, which is where our new X-Ray room is going. This will need to be demolished after they move out to allo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Salt Lake City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Hospital, Education, Hotel |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
