UAE West-East Pipeline Project
Sector: Oil and Gas • Location: United Arab Emirates
Source: New York Post
The UAE is constructing the West-East Pipeline, a 252-mile pipeline running parallel to the Fujairah pipeline, aiming to double the country's overland oil capacity to 3.6 million barrels a day. The project is about 50% complete and is expected to be finished by 2027.
- Status
- Under Construction
- Sector
- Oil and Gas
- Location
- United Arab Emirates
- Updated
- 22 Jul 2026
- Source
- New York Post
ConstructChat
Ask ConstructChat about UAE West-East Pipeline Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The UAE is constructing the West-East Pipeline, a 252-mile pipeline running parallel to the Fujairah pipeline, aiming to double the country's overland oil capacity to 3.6 million barrels a day. The project is about 50% complete and is expected to be finished by 2027. |
Original sector | Energy |
Location
Country | United Arab Emirates (UAE) |
Source
Source | New York Post |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-07-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
