UAE West-East Pipeline Project
Sector: Oil and Gas • Location: Fujairah, Abu Dhabi, United Arab Emirates
Source: The Straits Times
The UAE is constructing a new crude oil pipeline that bypasses the Strait of Hormuz. The project is about 50% complete as of May 20, 2026. The pipeline aims to double export capacity via the port of Fujairah by 2027, fast-tracked by ADNOC under the direction of Crown Prince Sheikh Khaled bin Mohamed bin Zayed.
- Status
- Under Construction
- Sector
- Oil and Gas
- Location
- Fujairah, Abu Dhabi, United Arab Emirates
- Updated
- 22 Jul 2026
- Source
- The Straits Times
ConstructChat
Ask ConstructChat about UAE West-East Pipeline Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The UAE is constructing a new crude oil pipeline that bypasses the Strait of Hormuz. The project is about 50% complete as of May 20, 2026. The pipeline aims to double export capacity via the port of Fujairah by 2027, fast-tracked by ADNOC under the direction of Crown Prince Sheikh Khaled bin Mohamed bin Zayed. |
Original sector | Energy |
Location
Country | United Arab Emirates (UAE) |
State | Abu Dhabi |
City | Fujairah |
Source
Source | The Straits Times |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
