UB Muni BESS

The status, timeline and source of this project. A free account opens every field.

Source: International Finance Corporation (IFC)

The project involves development, construction, operation and maintenance of a greenfield 50 megawatt (MW)/200 megawatt hours (MWh) battery energy storage system (BESS) located 130 km north east of Ulaanbaatar in Baganuur district of Ulaanbaatar City, Mongolia (the Project). The project will be owned by a Special Purpose Vehicle (“SPV”), which will be fully owned by Municipality of Ulaanbaatar’s (

Status
Prospective
Sector
Energy Storage, Warehouse, Road, Government
Location
Mongolia
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about UB Muni BESS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “UB Muni BESS” is an infrastructure initiative in the Energy Storage sector, located in Mongolia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves development, construction, operation and maintenance of a greenfield 50 megawatt (MW)/200 megawatt hours (MWh) battery energy storage system (BESS) located 130 km north east of Ulaanbaatar in Baganuur district of Ulaanbaatar City, Mongolia (the Project). The project will be owned by a Special Purpose Vehicle (“SPV”), which will be fully owned by Municipality of Ulaanbaatar’s (MUB) subsidiary, Ulaanbaatar Development Corporation (“UBDC”). UBDC is a holding company, and its assets are typically owned, developed and operated by subsidiary SPVs. The project will be built on a 9 hectare (ha) land that MUB owns and has provided to the SPV on a long-term lease basis. The project also involves a 400 m long overhead transmission line to connect to the grid substation.      The engineering, procurement and construction (EPC) contract for the Project has been awarded to Envision (https://www.envision-group.com/). Envision has engaged Monhorus (https://www.monhorus.mn/en/) for civil works and balance of plant electrical works including the transmission line. Further, Envision is contractually required to operate and maintain (O&M) the BESS plant for first two years from commissioning after which it will be handed over to UBDC for O&M. Construction at the project site started in Mid September 2024 and the project is in advanced stage of completion with commissioning scheduled for end December 2024.IFC is considering subscribing to a 300 billion MNT bond to be issued by MUB via private placement, specifically for the BESS project. The financing will be through a senior debt of up to US$65 million from IFC own account and a US$25 million concessional senior debt from the IFC-Canada Blended Climate Finance Program (BCFP). Further, IFC is considering an additional investment of up to US$90 million in the subsequent IFC MUB Bond(s) which is expected in 12-24 months for another BESS project or a similar project supporting the country’s energy needs.

Original sector

other

Location

Country

Mongolia

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Energy Storage, Warehouse, Road, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project