The project involves development, construction, operation and maintenance of a greenfield 50 megawatt (MW)/200 megawatt hours (MWh) battery energy storage system (BESS) located 130 km north east of Ulaanbaatar in Baganuur district of Ulaanbaatar City, Mongolia (the Project). The project will be owned by a Special Purpose Vehicle (“SPV”), which will be fully owned by Municipality of Ulaanbaatar’s (
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves development, construction, operation and maintenance of a greenfield 50 megawatt (MW)/200 megawatt hours (MWh) battery energy storage system (BESS) located 130 km north east of Ulaanbaatar in Baganuur district of Ulaanbaatar City, Mongolia (the Project). The project will be owned by a Special Purpose Vehicle (“SPV”), which will be fully owned by Municipality of Ulaanbaatar’s (MUB) subsidiary, Ulaanbaatar Development Corporation (“UBDC”). UBDC is a holding company, and its assets are typically owned, developed and operated by subsidiary SPVs. The project will be built on a 9 hectare (ha) land that MUB owns and has provided to the SPV on a long-term lease basis. The project also involves a 400 m long overhead transmission line to connect to the grid substation. The engineering, procurement and construction (EPC) contract for the Project has been awarded to Envision (https://www.envision-group.com/). Envision has engaged Monhorus (https://www.monhorus.mn/en/) for civil works and balance of plant electrical works including the transmission line. Further, Envision is contractually required to operate and maintain (O&M) the BESS plant for first two years from commissioning after which it will be handed over to UBDC for O&M. Construction at the project site started in Mid September 2024 and the project is in advanced stage of completion with commissioning scheduled for end December 2024.IFC is considering subscribing to a 300 billion MNT bond to be issued by MUB via private placement, specifically for the BESS project. The financing will be through a senior debt of up to US$65 million from IFC own account and a US$25 million concessional senior debt from the IFC-Canada Blended Climate Finance Program (BCFP). Further, IFC is considering an additional investment of up to US$90 million in the subsequent IFC MUB Bond(s) which is expected in 12-24 months for another BESS project or a similar project supporting the country’s energy needs. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Energy Storage projects in Mongolia
- Ulaanbaatar-Mandalgovi (Dundgovi) HVDC Transmission Line
- Preparing the Coal to Solar Transition in Ger Districts of Ulaanbaatar City
- Preparing the Coal to Solar Transition in Ger Districts of Ulaanbaatar City
- Preparing the Coal to Solar Transition in Ger Districts of Ulaanbaatar City
- Supporting Renewable Energy Development
- Supporting Renewable Energy Development