Uber Autonomous Vehicle Network
Planned · Last reported Nov 2025
Source: SSBCrack News
Uber has partnered with Nvidia to establish the world's largest network of nearly autonomous, Level 4 vehicles. The initiative aims to produce 100,000 vehicles starting in 2027, utilizing Nvidia's Drive AGX Hyperion 10 platform and software. Additionally, Uber has partnered with Lucid to develop a robotaxi service using Lucid's electric vehicles powered by Nuro's Level 4 driving technology. These
- Status
- Prospective
- Sector
- Electric Vehicles (EVs), Automotive
- Updated
- 22 Jul 2026
- Source
- SSBCrack News
ConstructChat
Ask ConstructChat about Uber Autonomous Vehicle Network
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Uber has partnered with Nvidia to establish the world's largest network of nearly autonomous, Level 4 vehicles. The initiative aims to produce 100,000 vehicles starting in 2027, utilizing Nvidia's Drive AGX Hyperion 10 platform and software. Additionally, Uber has partnered with Lucid to develop a robotaxi service using Lucid's electric vehicles powered by Nuro's Level 4 driving technology. These collaborations mark significant steps toward integrating self-driving capabilities into Uber's offerings. |
Original sector | Transportation |
Location
| Not available for this record. |
Source
Source | SSBCrack News |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Automotive |
Article published date | 2025-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects
- Misericordia Health Centre Phase 1
- X2222-01 Construct Direct Current Fast Charging Stations-Montauk & Roaring River State Parks
- Beyond Food Mart
- 5002 Petaluma Blvd North Retail Campus
- The Haven at Deer Creek
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 20 MDOULES 8 KW INSTALL EV CHARGER
- QLINE Streetcar Overhead Catenary System
- Metropolitan Park
