Uch Power II
Sector: Water Supply and Storage • Location: Pakistan
Source: International Finance Corporation (IFC)
The project is to develop a 404 MW gas-fired combined cycle power plant (“Uch II” or the “Project”) as an expansion to the existing 586 MW Uch Power Station (“Uch I”) owned and operated by Uch Power (Private) Limited (“UPL”) in Balochistan Province, Pakistan. UPL is an existing IFC client (Uch I project #4962). Uch II is designed to use the supply of indigenous gas in the Uch Gas Field (“UGF”).
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project is to develop a 404 MW gas-fired combined cycle power plant (“Uch II” or the “Project”) as an expansion to the existing 586 MW Uch Power Station (“Uch I”) owned and operated by Uch Power (Private) Limited (“UPL”) in Balochistan Province, Pakistan. UPL is an existing IFC client (Uch I project #4962). Uch II is designed to use the supply of indigenous gas in the Uch Gas Field (“UGF”). Uch I is also using the gas from UGF. The Project will be structured as a standalone Independent Power Plant and will be built on the site of Uch I, using the available vacant land within the Uch I property that was already acquired and fenced and will use some of the existing physical and management infrastructure. In addition to the infrastructure, the Project will benefit from synergies with the existing plant in the form of a shared management team as well as common utilization of O&M resources and administrative staff. Similar to the operating 586 MW Uch I plant, the Project is expected to be one of the lowest cost producers of power in the country. The Project will be established under a separate project company called Uch-II Power (Private) Limited (the “Company”). The Company will be 100% owned by International Power Plc., which is headquartered in London and is one of the world’s leading independent power generation companies with over 32,000 MW capacity worldwide. The total project cost is estimated at $500 million, and the proposed IFC investment is an A-loan for IFC’s own account of up to $100 million. The Project site is located about 600 km north of Karachi and 42 km in the north west of Jacobabad, in the Dera Murad Jamali sub-district of Balochistan Province. Uch I is located within a boundary wall covering an area of about 260 hectares of land and using about 30% of the total area. Uch II will require about 83.5 hectares of the existing land including a residential colony. The transmission line to evacuate power from Uch II will be developed by a separate entity called National Transmission and Dispatch Company (“NTDC”), a sub-division of WAPDA which is government owned. Based on the available information, NTDC is considering to develop (i) a 220 kV transmission line of about 125 km from Uch II to Sibbi, (ii) a 220 kV transmission line of about 0.5 km for looping in and out of the existing Uch I Power Plant – Shikarpur New 220 kV S/C transmission line at Uch II Power Plant, and (iii) reconductoring of 220 kV line section, about 1 km long between Uch I Power Plant and Uch II power Plant from single rail to twin bundled rail conductor. Gas will be supplied from Uch Gas Field about 47 km from Uch II site using an existing gas pipeline. For Uch I, UGF has existing dedicated 15 wells. For Uch II, additional 15 new gas wells will be developed by OGDCL (Oil & Gas Development Company Limited) to supply gas from UGF. Details of the water supply arrangement for Uch II are still to be finalized. The current plan is to receive water from the nearby Pat Feeder Canal using an existing water extraction permit by a new 3km underground water pipe to be constructed within the existing 100 m right of way and additional pumping station. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
