UCSC Cowell Storage Tanks Replacement
Sector: Consumer Products • Location: Santa Cruz, California, United States of America
Source: Dodge USA
Isolate and drain (2) tanks and disconnect piping and anchorage. Demo pipe as required for access. Salvage tube bundles. Rig, lift and haul off. Procure and install (2) replacement tanks in stainless steel. Re-connect piping, tube bundles and replace insulation.
- Status
- Prospective
- Sector
- Consumer Products, Steel, Government, Raw Materials, Commercial, Waste Processing and Treatment, Metal
- Location
- Santa Cruz, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about UCSC Cowell Storage Tanks Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Isolate and drain (2) tanks and disconnect piping and anchorage. Demo pipe as required for access. Salvage tube bundles. Rig, lift and haul off. Procure and install (2) replacement tanks in stainless steel. Re-connect piping, tube bundles and replace insulation. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Cruz |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Steel, Government, Raw Materials, Commercial, Waste Processing and Treatment, Metal |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
