UCSF Benioff Children's New Hospital
Design development · California · Last reported Jul 2025
Source: Dodge
Demolition of existing structures. The project will demolish two of the campus seismically incompliant buildings and replace them with a new 332523 -square-foot building spanning7 stories- and full basement -the new hospital building would house 128 inpatient beds, of which 72 beds would be relocated from the existing facilities on the Project site, and 82 beds would remain in the existing structu
- Status
- Prospective
- Sector
- Hospital, Government, Steel, Commercial
- Location
- Oakland, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about UCSF Benioff Children's New Hospital
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | design development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolition of existing structures. The project will demolish two of the campus seismically incompliant buildings and replace them with a new 332523 -square-foot building spanning7 stories- and full basement -the new hospital building would house 128 inpatient beds, of which 72 beds would be relocated from the existing facilities on the Project site, and 82 beds would remain in the existing structure |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Oakland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Hospital, Government, Steel, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
