logo

UCSF Mission Bay Platform Upgrade

Sector: Automotive • Location: San Francisco, California, United States of America

Source: SFMTA Projects

Project
Close

UCSF Mission Bay Platform Upgrade Share this: Facebook Twitter LinkedIn Project Introduction Note: As of January 7, 2023, the K Ingleside and T Third are no longer combined. The K Ingleside continues to run between Balboa Park and Embarcadero stations. The T Third runs between Sunnydale and Chinatown-Rose Pak Station via Central Subway. In anticipation of the new Chase Center and the growth in job

Project Information FAQ

Project Information

4 Q
The project “UCSF Mission Bay Platform Upgrade” is an infrastructure initiative in the Automotive sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from SFMTA Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

UCSF Mission Bay Platform Upgrade Share this: Facebook Twitter LinkedIn Project Introduction Note: As of January 7, 2023, the K Ingleside and T Third are no longer combined. The K Ingleside continues to run between Balboa Park and Embarcadero stations. The T Third runs between Sunnydale and Chinatown-Rose Pak Station via Central Subway. In anticipation of the new Chase Center and the growth in jobs, housing, healthcare and retail in the Mission Bay, the SFMTA constructed a new center platform along 3rd Street between South and 16th streets. This new, larger platform services both the inbound and outbound trains and greatly expands transit capacity for large crowds. The two fomer platforms, which were split as separate inbound and outbound, were demolished as part of the project. The greater size of the new and improved platform enables four, two-car trains to load simultaneously during larger events. When needed, the platform will also allow for trains to depart inbound from both sides of the platform to connect customers quickly to BART, CalTrain and eventually the Central Subway. During parts of fall 2018 and winter 2019, work on the platform required bus substitution on a portion of the KT: K Ingleside/T Third line. K Ingleside trains operated from Balboa Park to Embarcadero Station. T Third Buses traveled from Spear & Market to Bayshore Boulevard and Sunnydale Avenue. Buses services all stops on the surface and signs helped direct customers to the boarding locations. Some stops had modified locations due to construction activities. Customers traveling on Muni Metro with a destination towards Bayshore and Sunnydale transfered to a T Third bus at Embarcadero Station. Construction elements included in the project: Remove the two existing platforms at 3rd and South streets Build a new center island platform Widen the track to accommodate the new island platform Install new overhead wires that power trains Update utility lines and street lights to support the new center island platform Upgrade the traffic signals at 3rd and South streets as well as 3rd Street and Campus lane Project Updates UCSF Mission Bay (Gene Friend Way) Platform Closed T Third Bus Substitution for Approximately Ten Days Starting July 27 (2019) T Third Bus Substitution The T Third line will be replaced with bus service. Please visit the T Third Bus Substitution page for information on NextMuni predictions, schedules and boarding locations. Construction Schedule and Summary (Updated 7/16/2019) Phase Start End Work Happening A November 25, 2018 November 26, 2018 Partial platform demolition, including cutting concrete on platform Part of 3rd St will be closed and Muni will reroute B November 30, 2018 December 3, 2018 Full demolition of platform, some track work Part of 3rd St will be closed and Muni will reroute C January 22, 2019 February 9, 2019 Track work, begin platform reconstruction Part of 3rd St will be closed and Muni will reroute D February 9, 2019 End of March 2019 Continue platform construction 3rd St will reopen to traffic E Saturday, May 25, 2019 4:00 a.m. For approximately 10 days Continue platform construction 3rd St will remain open to traffic E Saturday, July 27, 2019 4:00 a.m. For approximately 10 days Continue platform construction Rail work and planned platform testing T Third rail service returns after Phase E, but work on the Mission Bay Platform will continue. Board the T Third train at either Mission Rock or Mariposa . Other Muni Changes E Embarcadero Shutdown Saturday, July 27, 2019 to continue Phase E construction. Project Timeline Summer 2018 Planning and design Pending Early 2019 Bus Substitution Pending Summer 2019 Substantial Completion Pending Cost Estimate $50 M Predicted Completion Summer 2019 Project Status Completed Project Success On budget On schedule Improvements Bus Routes and Rail Lines E Embarcadero (Suspended) F Market & Wharves K Ingleside T Third Street Neighborhoods South of Market (SoMa) Contact Information Erin McMillan UCSFplatform@SFMTA.com 415.646.2445

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data