UG - Private Power Generation (Bujagali) Project
One of 3,348 projects Taiyo tracks in Uganda.
Source: World Bank
The Private Power Generation (Bujagali) Project's main objective is to provide least-cost power generation capacity that will eliminate power shortages at the time of its commissioning. The following are the components of the Project: a) the power station which is designed to house the complete generation plant and all five units, and to carry out all operational and maintenance related activities
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Wind, Hotel, Commercial, Hydro, Government
- Location
- Uganda
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about UG - Private Power Generation (Bujagali) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Private Power Generation (Bujagali) Project's main objective is to provide least-cost power generation capacity that will eliminate power shortages at the time of its commissioning. The following are the components of the Project: a) the power station which is designed to house the complete generation plant and all five units, and to carry out all operational and maintenance related activities; b) The power intakes which will be capable of operating over the full range of Head Pond levels and turbine discharges without hydraulic instability or vortex formation; c) Spillways and dam embankment; d) The tailrace canalization which will be excavated down to 1,070.5 meters above mean sea level at the outlet of the draft tubes; e) Abutments and substation; f) Access roads; g) Impoundment area; h) Engineering, procurement and transportation; and i) Reservoir filling. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Uganda |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Wind, Hotel, Commercial, Hydro, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Uganda
- Kampala-Jinja Expressway Phase I
- Uganda - Road Sector Support Project
- Uganda - Community Agricultural Infrastructure Improvement Programme - Project 1 (CAIIP-P1)
- Uganda - Kabale-Lake Bunyonyi/Kisoro-Mgahinga Roads Upgrading Project
- Engie's Mini-grid projects
- EASTERN AFRICA TRANSPORT CORRIDOR
- Isimba Hydropower Project
- New Bridge across River Nile at Jinja
