logo
ProjectClosed

UG - Private Power Generation (Bujagali) Project

Sector: Road • Location: Uganda

Source: World Bank Group

The Private Power Generation (Bujagali) Project's main objective is to provide least-cost power generation capacity that will eliminate power shortages at the time of its commissioning. The following are the components of the Project: a) the power station which is designed to house the complete generation plant and all five units, and to carry out all operational and maintenance related activities

Status
Closed
Sector
Road, Water Supply and Storage, Power Generation (CCGT), Wind, Hotel, Commercial, Hydro, Government
Location
Uganda
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about UG - Private Power Generation (Bujagali) Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “UG - Private Power Generation (Bujagali) Project” is an infrastructure initiative in the Road sector, located in Uganda. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Private Power Generation (Bujagali) Project's main objective is to provide least-cost power generation capacity that will eliminate power shortages at the time of its commissioning. The following are the components of the Project: a) the power station which is designed to house the complete generation plant and all five units, and to carry out all operational and maintenance related activities; b) The power intakes which will be capable of operating over the full range of Head Pond levels and turbine discharges without hydraulic instability or vortex formation; c) Spillways and dam embankment; d) The tailrace canalization which will be excavated down to 1,070.5 meters above mean sea level at the outlet of the draft tubes; e) Abutments and substation; f) Access roads; g) Impoundment area; h) Engineering, procurement and transportation; and i) Reservoir filling.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Uganda

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Power Generation (CCGT), Wind, Hotel, Commercial, Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project