UG Cable Replacement
Sector: Metal • Location: Battle Ground, Washington, United States of America
Source: Dodge USA
Scope - The project includes the following work: Replace (1) distribution pole and crossarm, underground trenching and/or boring work, providing and installing conduit, installing and energizing approx. 6,900 jacketed 1/0 AL primary conductor, replacing (3) 1 transformers, replacing (1) metal 1 junction box, and other associated work as described in the Summary of Wo
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Scope - The project includes the following work: Replace (1) distribution pole and crossarm, underground trenching and/or boring work, providing and installing conduit, installing and energizing approx. 6,900 jacketed 1/0 AL primary conductor, replacing (3) 1 transformers, replacing (1) metal 1 junction box, and other associated work as described in the Summary of Wo |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Metal projects in United States of America
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- Crystal City Substation Improvement and Expansion
