UG Cable Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Project Description: The project includes the following work: Underground trenching and/or boring work, providing and installing conduit, installing and energizing approx. 13,800 jacketed 1/0 AL primary conductor, replacing 1 transformers, replacing and/or installing junction boxes, and other associated work at two adjacent work locations as described in the Summary of Work. A. The Contractor shal
- Status
- Closed
- Sector
- Power Generation (CCGT), Telecommunications, Power Transmission, Government, Commercial
- Location
- Washougal, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about UG Cable Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Description: The project includes the following work: Underground trenching and/or boring work, providing and installing conduit, installing and energizing approx. 13,800 jacketed 1/0 AL primary conductor, replacing 1 transformers, replacing and/or installing junction boxes, and other associated work at two adjacent work locations as described in the Summary of Work. A. The Contractor shall perform the Work as required by the Contract Documents in a manner that will minimize the disru... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Washougal |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Telecommunications, Power Transmission, Government, Commercial |
Article published date | 2023-07-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
