logo
ProjectClosed

UG-Power SIL 4 (FY02)

Sector: Water Supply and Storage • Location: Uganda

Source: World Bank Group

The Fourth Power Project seeks to improve power supply to meet demand by supporting critically needed investments in the sub-sector; and strengthen Borrower capacity to manage reform, privatization, and development in the power and the petroleum sub-sectors. The project consists of four components: 1) The first component will support power system expansion and rehabilitation. The project will fina

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Hydro, Government
Location
Uganda
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about UG-Power SIL 4 (FY02)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “UG-Power SIL 4 (FY02)” is an infrastructure initiative in the Water Supply and Storage sector, located in Uganda. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Fourth Power Project seeks to improve power supply to meet demand by supporting critically needed investments in the sub-sector; and strengthen Borrower capacity to manage reform, privatization, and development in the power and the petroleum sub-sectors. The project consists of four components: 1) The first component will support power system expansion and rehabilitation. The project will finance the supply and installation of the power plant Units 14 and 15 at Kiira; system rehabilitation, and institutional support. 2) The second component will finance procurement of required equipment for the implementation of the environmental monitoring plan and the recruitment of an environmental officer to oversee it. 3) The third component will support power sector development and reform via a study on Water Management at Lake Victoria, development of an energy end-use efficiency program, annual consumer satisfaction surveys, and sector studies and preparation of future projects. 4) The last component will support petroleum sector development and reform via acquisition of petroleum product quality monitoring equipment, specialized advisory services to Ministry of Energy and Mineral Development (MEMD), training of MEMD staff.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Uganda

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project