logo
Project

Uganda - Alternative Energy Resource Assessment and Utilization Study

One of 3,348 projects Taiyo tracks in Uganda.

Source: African Development Bank (AfDB)

The Bank's intervention in support of the proposed study is important for supporting the Government’s efforts to develop alternative energy resources for rural electrification and provision of other energy services as part of the PEAP. The Study will enable the Ministry of Energy and Mineral Development (MEMD) to formulate a flexible least-cost Alternative Energy Resources Development Programme (A

Sector
Power Generation (CCGT), Government
Location
Uganda
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Uganda - Alternative Energy Resource Assessment and Utilization Study

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Uganda - Alternative Energy Resource Assessment and Utilization Study” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Uganda. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Bank's intervention in support of the proposed study is important for supporting the Government’s efforts to develop alternative energy resources for rural electrification and provision of other energy services as part of the PEAP. The Study will enable the Ministry of Energy and Mineral Development (MEMD) to formulate a flexible least-cost Alternative Energy Resources Development Programme (AERDP) that can be adapted to changing conditions. The AERDP shall cover a 15- year period (2005-2020), and shall be defined on the basis of technical viability, environmental and socio-economic soundness and sustainability, and least-cost principles. The plans shall provide the framework within which short to medium term projects shall be designed while allowing for regular annual reviews to incorporate changing economic, social, and environmental conditions over the medium to long term. The study shall be carried out in three phases as follows: (i) Programme Formulation ; (ii) Preparation, within the framework of the Programme defined in Phase I, of feasibility studies of priority projects for five of the most highly energy deficient rural areas/towns; (iii) Preparation of detailed designs for the least-cost projects selected in Phase II. It shall be carried out over a period of 13 months. The estimated total cost of the Study, net of taxes, is UA 1.81 million.

Original sector

Energy

Budget

Location

Country

Uganda

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project