Uganda - Alternative Energy Resource Assessment and Utilization Study
Sector: Power Generation (CCGT) • Location: Uganda
Source: African Development Bank (AfDB)
The Bank's intervention in support of the proposed study is important for supporting the Government’s efforts to develop alternative energy resources for rural electrification and provision of other energy services as part of the PEAP. The Study will enable the Ministry of Energy and Mineral Development (MEMD) to formulate a flexible least-cost Alternative Energy Resources Development Programme (A
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Bank's intervention in support of the proposed study is important for supporting the Government’s efforts to develop alternative energy resources for rural electrification and provision of other energy services as part of the PEAP. The Study will enable the Ministry of Energy and Mineral Development (MEMD) to formulate a flexible least-cost Alternative Energy Resources Development Programme (AERDP) that can be adapted to changing conditions. The AERDP shall cover a 15- year period (2005-2020), and shall be defined on the basis of technical viability, environmental and socio-economic soundness and sustainability, and least-cost principles. The plans shall provide the framework within which short to medium term projects shall be designed while allowing for regular annual reviews to incorporate changing economic, social, and environmental conditions over the medium to long term. The study shall be carried out in three phases as follows: (i) Programme Formulation ; (ii) Preparation, within the framework of the Programme defined in Phase I, of feasibility studies of priority projects for five of the most highly energy deficient rural areas/towns; (iii) Preparation of detailed designs for the least-cost projects selected in Phase II. It shall be carried out over a period of 13 months. The estimated total cost of the Study, net of taxes, is UA 1.81 million. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
