logo

Uganda - Rural Towns Water Supply and Sanitation Study

Sector: Water Supply and Storage • Location: Uganda

Source: African Development Bank (AfDB)

Project

The proposed study is formulated within the framework of the poverty alleviation objectives elaborated in the Uganda Poverty Eradication Action Plan (PEAP) that underpins the overall development goals of the country. It is designed in line with the principles of the 1999 National Water Policy, which promotes water sector development on the basis of integrated water resource management, as does th

Project Information FAQ

Project Information

4 Q
The project “Uganda - Rural Towns Water Supply and Sanitation Study” is an infrastructure initiative in the Water Supply and Storage sector, located in Uganda. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed study is formulated within the framework of the poverty alleviation objectives elaborated in the Uganda Poverty Eradication Action Plan (PEAP) that underpins the overall development goals of the country. It is designed in line with the principles of the 1999 National Water Policy, which promotes water sector development on the basis of integrated water resource management, as does the Bank Group’s policy on Integrated Water Resource Management. The study involves updating and deepening the scope and detail of the 1994 feasibility studies for the towns of Apac, Iganga, Kigumba, Mityana and Mpigi, and carrying out new ones for Nebbi and Pakwach. The seven towns proposed for the Bank Group intervention are in some of the poorest districts of the country. Despite the relatively high populations of the towns, only one, Iganga, has pipe borne water supply and sewerage, both of which are in very poor conditions. The remaining six towns rely on protected springs, boreholes, and wells which are few in number, not well distributed in the towns or well located relative to pit latrines. The study shall be executed in three phases: It shall start-off with the definition of a long-term Strategic Development Plan for each of the target towns. The plan for each town shall cover 15 years starting 2003 to 2018; Feasibility Studies; and Preparation of Detailed Designs and Tender Documents. The estimated total cost of the study net of taxes is UA 1.78 million

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data