logo

Uganda - The Road Sector Support Project III

Sector: Raw Materials • Location: Uganda

Source: African Development Bank (AfDB)

Project

The Road Sector Support Project 3 (RSSP3): Nyakahita–Ibanda–Kamwenge Road Upgrading starts at Nyakahita on the Masaka–Mbarara highway traversing the districts of Kiruhura, Ibanda and Kamwenge. The terrain is a plateau with laterised flat hills and flat undulating plains. Expected outputs of the project are a 143 km new bitumen road with 6.0 m carriageway and 1.50 m shoulders on either side between

Project Information FAQ

Project Information

4 Q
The project “Uganda - The Road Sector Support Project III” is an infrastructure initiative in the Raw Materials sector, located in Uganda. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Road Sector Support Project 3 (RSSP3): Nyakahita–Ibanda–Kamwenge Road Upgrading starts at Nyakahita on the Masaka–Mbarara highway traversing the districts of Kiruhura, Ibanda and Kamwenge. The terrain is a plateau with laterised flat hills and flat undulating plains. Expected outputs of the project are a 143 km new bitumen road with 6.0 m carriageway and 1.50 m shoulders on either side between Nyakahita, Ibanda and Kamwenge; a weigh-bridge installed at appropriate location to control vehicle over-load; fully implemented Environmental and Social Management Plan (ESMP); Resettlement Action Plan (RAP); Immuno Virus / Acquired Immune Deficiency Syndrome (HIV/AIDS) and road safety education. The project will also produce feasibility and detailed engineering design studies for Kayunga–Galiraya (83km) and Hoima–Butiaba–Wanseko (111km) roads. The project is to be implemented over a five year period for a total financial requirement of Unit of Account (UA) 110.27 million, of which UA 80.0 million will be financed through and African Development Fund (ADF) loan.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data