logo
Project

Uganda - The Road Sector Support Project III

Sector: Mass Transit • Location: Uganda

Source: African Development Bank (AfDB)

The Road Sector Support Project 3 (RSSP3): Nyakahita–Ibanda–Kamwenge Road Upgrading starts at Nyakahita on the Masaka–Mbarara highway traversing the districts of Kiruhura, Ibanda and Kamwenge. The terrain is a plateau with laterised flat hills and flat undulating plains. Expected outputs of the project are a 143 km new bitumen road with 6.0 m carriageway and 1.50 m shoulders on either side between

Sector
Mass Transit, Government, Education, Hospital, Raw Materials, Road, Bridge, Rail
Location
Uganda
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Uganda - The Road Sector Support Project III

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Uganda - The Road Sector Support Project III” is an infrastructure initiative in the Mass Transit sector, located in Uganda. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Road Sector Support Project 3 (RSSP3): Nyakahita–Ibanda–Kamwenge Road Upgrading starts at Nyakahita on the Masaka–Mbarara highway traversing the districts of Kiruhura, Ibanda and Kamwenge. The terrain is a plateau with laterised flat hills and flat undulating plains. Expected outputs of the project are a 143 km new bitumen road with 6.0 m carriageway and 1.50 m shoulders on either side between Nyakahita, Ibanda and Kamwenge; a weigh-bridge installed at appropriate location to control vehicle over-load; fully implemented Environmental and Social Management Plan (ESMP); Resettlement Action Plan (RAP); Immuno Virus / Acquired Immune Deficiency Syndrome (HIV/AIDS) and road safety education. The project will also produce feasibility and detailed engineering design studies for Kayunga–Galiraya (83km) and Hoima–Butiaba–Wanseko (111km) roads. The project is to be implemented over a five year period for a total financial requirement of Unit of Account (UA) 110.27 million, of which UA 80.0 million will be financed through and African Development Fund (ADF) loan.

Original sector

Transport & Storage

Budget

Location

Country

Uganda

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Mass Transit, Government, Education, Hospital, Raw Materials, Road, Bridge, Rail

Article published date

2026-03-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project