logo

Uganda Development Response to Displacement Impacts Project in the Horn of Africa Phase II

Sector: Road • Location: Eastern and Southern Africa

Source: World Bank Group

Project
Dropped

BackgroundThis operation will be the second phase of the Development Response to Displacement Impacts Project (DRDIP) in Uganda. Phase I, which closed on June 30, 2024, was a regional operation (P152822) that covered Djibouti, Ethiopia, and Uganda. A sister regional project in Kenya (P161067) closed on April 28, 2024. A second phase of DRDIP is currently being implemented in Ethiopia (P178047). Th

Project Information FAQ

Project Information

5 Q
The project “Uganda Development Response to Displacement Impacts Project in the Horn of Africa Phase II” is an infrastructure initiative in the Road sector, located in Eastern and Southern Africa. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

dropped

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

BackgroundThis operation will be the second phase of the Development Response to Displacement Impacts Project (DRDIP) in Uganda. Phase I, which closed on June 30, 2024, was a regional operation (P152822) that covered Djibouti, Ethiopia, and Uganda. A sister regional project in Kenya (P161067) closed on April 28, 2024. A second phase of DRDIP is currently being implemented in Ethiopia (P178047). This operation (P180844) will be exclusively for Uganda, though will remain part of the DRDIP Series of Projects.Uganda is the largest refugee-hosting country in Africa and the fifth largest worldwide. Uganda currently plays host to over 1.8 million refugees, most of whom originate from South Sudan (54%) or the Democratic Republic of the Congo (31%). The majority of refugees face protracted displacement and reside in settlements, which are mostly located in the periphery of the country. The refugee-hosting areas are generally poor. In some cases, the development challenges in these locations are exacerbated by the refugee presence, which can place a strain on access to basic services, such as education, health, water and sanitation. The refugee presence also offers significant economic opportunities through labor, remittances, existing capital and by attracting humanitarian and development assistance.Uganda's progressive policies for refugee protection are recognized worldwide. Uganda is a signatory to the Global Compact on Refugees. Its 2006 Refugees Act and 2010 Regulations provide refugees with key rights - including the right to land inside refugee settlements. The 2010 Regulations and also integrate refugee concerns into local development plans. Project ObjectiveThe project development objective is to "improve access to basic social and economic services, expand livelihood opportunities and enhance environmental management for host communities and refugees in the target areas."As per Phase I, the main implementation approach will be community driven development (CDD), whereby host communities and refugees will be facilitated to analyze their own development problems, identify solutions and then implement and maintain their own subprojects, working with the local government.In addition to enhancing access to services, environmental management and livelihood, the project will also include a strong focus on strengthening social cohesion between refugees and host communities. Project Financing and ComponentsThis US$278 million project will include US$250 million from the IDA Window for Host Communities and Refugees (WHR). Activities will be implemented through five components:1. Social and economic services and infrastructureThis component will support community-based infrastructure to enhance access to and quality of basic services, such as education, health, water supply and sanitation. It will also support economic infrastructure, including roads and markets. Three sub-components will be supported, including: (i) Community & Strategic Investment Fund; (ii) Strengthening Local Planning and Decentralized Service Delivery; and (iii) Displacement Crisis Response Mechanism.2. Integrated natural resource managementThe project will support Integrated Natural Resource Management activities to mitigate the impact of the refugee presence on the environment and to contribute to the addressing Uganda's major land degradation crisis. Most activities will be implemented using a Labor Intensive Public Works (LIPW) approach to put cash in the hands of poor host community members and refugees. There will be two sub-components: (i) Land restoration and protection; and (ii) Expansion of tree cover. 3. Livelihoods Support Program This component will support the development and expansion of traditional and non-traditional livelihoods of beneficiary households to increase income-earning opportunities. Compared to Phase I there will be a greater emphasis on private sector engagement through public-private coordination platforms and linking activities to local value chains. There will be two sub-components: (i) Community livelihoods for self-reliance; and (ii) Capacity-building of Community Institutions for Livelihoods. 4. Project management, accountability systems and coordinationThis component will ensure effective management, monitoring and evaluation and learning for the project implementation support team. For Phase II under this component a particular emphasis will be placed on strengthening the capacity of the Office of the Prime Minister to coordinate and oversee the extensive portfolio of humanitarian and development assistance for refugee inclusion in Uganda. The Inspectorate of Government will support transparency, accountability and anti-corruption measures. 5. Contingent Emergency Response Component (CERC)Under the CERC, in the event of an eligible crisis or emergency, funds may be reallocated from other components of the project. This component, if activated, would finance rapid response measures and early recovery activities to address disaster, emergency and/or catastrophic events at the community level.Geographic coveragePhase II will cover the 12 Refugee-Hosting Districts. The project coverage area will also be expanded to include selected transit districts and secondary cities. The project will run from for five years from 2025 to 2030. It will be implemented by the Office of the Prime Minister of the Government of Uganda.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data