logo

Uganda Power Sector Development Project

Sector: Road • Location: Uganda

Source: World Bank Group

Project
Closed

The primary objectives of the Power Sector Development Operation Project in Uganda are to reduce short-term power shortages and financial imbalances, and facilitate orderly longer-term expansion of electricity service. In order to achieve these objectives, the Operation comprises: (a) a set of investments and policy measures designed to reduce the supply-demand gap until the Bujagali hydropower pl

Status
Closed
Sector
Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Geothermal, Hotel, Government
Location
Uganda
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Uganda Power Sector Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Uganda Power Sector Development Project” is an infrastructure initiative in the Road sector, located in Uganda. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The primary objectives of the Power Sector Development Operation Project in Uganda are to reduce short-term power shortages and financial imbalances, and facilitate orderly longer-term expansion of electricity service. In order to achieve these objectives, the Operation comprises: (a) a set of investments and policy measures designed to reduce the supply-demand gap until the Bujagali hydropower plant comes into service in 2011; (b) financial support for the Government to absorb a part of the high costs of short-term thermal power generation; and (c) policy measures aimed at making the sector financially viable, accelerating rural electrification, and moving towards a sector-wide approach for development. The project portion of the operation comprises two components. Component 1 will provide partial co-financing towards the capacity and energy charges of a 50MW thermal plant to be installed at Mutundwe, Kampala. Component 2 will provide Technical Assistance and Energy Efficiency. Activities under this component will include: (a) Energy Efficiency and Demand Side Management ;(b) Independent Evaluation of the Rural Electrification Program; (c) Poverty and Social Impact Analysis (PSIA); (d) Power Sector Medium-term Investment Plan; (e) Lake Victoria Transmission Ring Pre-feasibility and Feasibility Studies; (f) Kalagala Offset Tourism Development Plan; and (g) Energy Sector Communications Strategy.

Original sector

FY17 - Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Uganda

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Geothermal, Hotel, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project