Uganda-South Sudan Interconnection Project
Sector: Power Generation (CCGT) • Location: Uganda
Source: Construction Review
The Uganda-South Sudan interconnection project aims to integrate South Sudan into the East African Pool Network, addressing electricity shortages and improving the reliability and affordability of electricity supply. The project includes the construction of a 299-kilometer electricity interconnection and the establishment of substations in both countries.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government
- Location
- Uganda
- Updated
- 22 Jul 2026
- Source
- Construction Review
ConstructChat
Ask ConstructChat about Uganda-South Sudan Interconnection Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Uganda-South Sudan interconnection project aims to integrate South Sudan into the East African Pool Network, addressing electricity shortages and improving the reliability and affordability of electricity supply. The project includes the construction of a 299-kilometer electricity interconnection and the establishment of substations in both countries. |
Original sector | Energy |
Budget |
Location
Country | Uganda |
Source
Source | Construction Review |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
