logo
ProjectPipeline

Uganda: Uganda-Tanzania Interconnector Project

Pipeline · Uganda

Source: World Bank Group

The Project will mainly comprise construction of a 400 kV double-circuit transmission line (approximately 260 km within Uganda) and associated substations to interconnect Uganda’s power grid with regional networks. The proposed project supports the implementation of a priority connection in the East Africa region and creates conditions for grid expansion in an access-deficit country. It forms an i

Status
Prospective
Sector
Solar, Power Generation (CCGT), Commercial, Hydro, Government
Location
Uganda
Updated
19 Nov 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Uganda: Uganda-Tanzania Interconnector Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Uganda: Uganda-Tanzania Interconnector Project” is an infrastructure initiative in the Solar sector, located in Uganda. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

pipeline

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Project will mainly comprise construction of a 400 kV double-circuit transmission line (approximately 260 km within Uganda) and associated substations to interconnect Uganda’s power grid with regional networks. The proposed project supports the implementation of a priority connection in the East Africa region and creates conditions for grid expansion in an access-deficit country. It forms an integral part of the East Africa Power Pool (EAPP) backbone transmission grid and enhances the reliability of power interchanges with the Southern Africa Power Pool (SAPP). The proposed line also strengthens interconnections among Nile Equatorial Lake (NEL) countries. Overall, the project supports the objectives of the region’s power pools (SAPP and EAPP) to optimize energy flows, maximize economic trading, increase supply security, and reduce both carbon emissions and the cost of electricity. The transmission line will help achieve benefits from increased access to electricity, sharing of natural resources, more affordable electricity prices, and improved system reliability through regional support.The Project will comprise the following components: (a) Component 1: Construction of approximately 260 km of 400 kV double-circuit transmission line (Wobulenxi-Masaka-Mutukula) and associated substations at Masaka and Wobulenzi (Uganda). (b) Component 2: Environmental and Social Mitigation, supporting implementation of Environmental Management Plans (including biodiversity offsets), Resettlement Action Plans (RAP), and Livelihood Restoration Action Plans (LRAP). (c) Component 3: Project Implementation Support and Institutional Enhancement, including detailed line design, contractor procurement, and supervision. This component will also enhance institutional capacities of relevant utilities and sector institutions for operation of integrated transmission systems and power trade, including capacity building on climate mitigation and adaptation and implementation of a gender action plan to attract, hire, promote, and retain female talent in the energy sector.

Original sector

Energy and Mineral Resources,Public Administration,Social Sustainability and Inclusion

Location

Country

Uganda

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Commercial, Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project