logo

Uganda: Uganda-Tanzania Interconnector Project

Sector: Solar • Location: Uganda

Source: World Bank Group

Project
Pipeline

The Project will mainly comprise construction of a 400 kV double-circuit transmission line (approximately 260 km within Uganda) and associated substations to interconnect Uganda’s power grid with regional networks. The proposed project supports the implementation of a priority connection in the East Africa region and creates conditions for grid expansion in an access-deficit country. It forms an i

Project Information FAQ

Project Information

4 Q
The project “Uganda: Uganda-Tanzania Interconnector Project” is an infrastructure initiative in the Solar sector, located in Uganda. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pipeline

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project will mainly comprise construction of a 400 kV double-circuit transmission line (approximately 260 km within Uganda) and associated substations to interconnect Uganda’s power grid with regional networks. The proposed project supports the implementation of a priority connection in the East Africa region and creates conditions for grid expansion in an access-deficit country. It forms an integral part of the East Africa Power Pool (EAPP) backbone transmission grid and enhances the reliability of power interchanges with the Southern Africa Power Pool (SAPP). The proposed line also strengthens interconnections among Nile Equatorial Lake (NEL) countries. Overall, the project supports the objectives of the region’s power pools (SAPP and EAPP) to optimize energy flows, maximize economic trading, increase supply security, and reduce both carbon emissions and the cost of electricity. The transmission line will help achieve benefits from increased access to electricity, sharing of natural resources, more affordable electricity prices, and improved system reliability through regional support.The Project will comprise the following components: (a) Component 1: Construction of approximately 260 km of 400 kV double-circuit transmission line (Wobulenxi-Masaka-Mutukula) and associated substations at Masaka and Wobulenzi (Uganda). (b) Component 2: Environmental and Social Mitigation, supporting implementation of Environmental Management Plans (including biodiversity offsets), Resettlement Action Plans (RAP), and Livelihood Restoration Action Plans (LRAP). (c) Component 3: Project Implementation Support and Institutional Enhancement, including detailed line design, contractor procurement, and supervision. This component will also enhance institutional capacities of relevant utilities and sector institutions for operation of integrated transmission systems and power trade, including capacity building on climate mitigation and adaptation and implementation of a gender action plan to attract, hire, promote, and retain female talent in the energy sector.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data