Uhlmann Office Building / Barkow Leibinger + Kinzo
Sector: Cement • Location: Germany
Source: ArchDaily
Inside, the orthogonal office floor plan, the rigorous aligning of two cores made of exposed concrete, and the regularity of the façade grid stand in interesting contrast to the work environments designed by KINZO, which are characterized by playful shapes and strong touches of color.Text description provided by the architects.After the completion of the first construction phase for logistics and
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Inside, the orthogonal office floor plan, the rigorous aligning of two cores made of exposed concrete, and the regularity of the façade grid stand in interesting contrast to the work environments designed by KINZO, which are characterized by playful shapes and strong touches of color.Text description provided by the architects.After the completion of the first construction phase for logistics and production in 2016, the next step in the master planning for the mechanical engineering corporation Uhlmann was completed at the beginning of 2021.A four-story office building provides space for about 300 employees on the company’s campus inLaupheim. Located directly on Uhlmannstraße, the building is an important building block of the “meander,” the foundational design principle of the master plan from 2013. Together with the logistics and production building, it forms a 300 m long front and thus marks the representative introduction to the campus for visitors.A combination of glass surfaces that can be used for natural ventilation through window sashes, and opaque panels made of white glass, ensures that the building has an energetically economical façade. At the same time, the interplay of silver anodized aluminum fins and glazed openings take up the formal vocabulary of the logistics and production building. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
