logo

Uhlmann Office Building / Barkow Leibinger + Kinzo

Sector: Cement • Location: Germany

Source: ArchDaily

Project
Closed

Inside, the orthogonal office floor plan, the rigorous aligning of two cores made of exposed concrete, and the regularity of the façade grid stand in interesting contrast to the work environments designed by KINZO, which are characterized by playful shapes and strong touches of color.Text description provided by the architects.After the completion of the first construction phase for logistics and

Project Information FAQ

Project Information

3 Q
The project “Uhlmann Office Building / Barkow Leibinger + Kinzo” is an infrastructure initiative in the Cement sector, located in Germany. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Inside, the orthogonal office floor plan, the rigorous aligning of two cores made of exposed concrete, and the regularity of the façade grid stand in interesting contrast to the work environments designed by KINZO, which are characterized by playful shapes and strong touches of color.Text description provided by the architects.After the completion of the first construction phase for logistics and production in 2016, the next step in the master planning for the mechanical engineering corporation Uhlmann was completed at the beginning of 2021.A four-story office building provides space for about 300 employees on the company’s campus inLaupheim. Located directly on Uhlmannstraße, the building is an important building block of the “meander,” the foundational design principle of the master plan from 2013. Together with the logistics and production building, it forms a 300 m long front and thus marks the representative introduction to the campus for visitors.A combination of glass surfaces that can be used for natural ventilation through window sashes, and opaque panels made of white glass, ensures that the building has an energetically economical façade. At the same time, the interplay of silver anodized aluminum fins and glazed openings take up the formal vocabulary of the logistics and production building.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data