UHM - Control Center Watanabe Hall Room 316 Renovation
Sector: Metal • Location: Honolulu, Hawaii, United States of America
Source: Dodge
The scope of work includes selective demolition, new corner guard, finish cabinetry, countertop, penetrating firestopping, sealants, new fire rated hollow metal double doors and associated door frame, door hardware, gypsum board furring, interior walls, and ceiling soffits, resilient tile flooring neat the sink area, new carpet tile, interior painting, added fire extinguishers, hazardous materials
- Status
- Closed
- Sector
- Metal, Education, Commercial, Manufacturing (Industrial)
- Location
- Honolulu, Hawaii, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about UHM - Control Center Watanabe Hall Room 316 Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work includes selective demolition, new corner guard, finish cabinetry, countertop, penetrating firestopping, sealants, new fire rated hollow metal double doors and associated door frame, door hardware, gypsum board furring, interior walls, and ceiling soffits, resilient tile flooring neat the sink area, new carpet tile, interior painting, added fire extinguishers, hazardous materials removal, addressable fire alarm, plumbing fixture and associated plumbing, new air conditioning ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Hawaii |
City | Honolulu |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Education, Commercial, Manufacturing (Industrial) |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
