logo

Ukrgrafit

Sector: Water Supply and Storage • Location: Ukraine

Source: European Bank for Reconstruction and Development (EBRD)

Project
Complete

Translated version of this PSD: Ukrainian The proposed project is designed to support Ukrgrafit in financing of the reconstruction and modernisation of the manufacturing facilities and introducing energy efficient technologies into the production cycle. The transition impact and demonstration effects associated with this potential investment are expected to include: Ukrgrafit is the only Ukrainian

Project Information FAQ

Project Information

4 Q
The project “Ukrgrafit” is an infrastructure initiative in the Water Supply and Storage sector, located in Ukraine. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Translated version of this PSD: Ukrainian The proposed project is designed to support Ukrgrafit in financing of the reconstruction and modernisation of the manufacturing facilities and introducing energy efficient technologies into the production cycle. The transition impact and demonstration effects associated with this potential investment are expected to include: Ukrgrafit is the only Ukrainian manufacturer of graphite electrodes for electric steel, electric-arc furnaces and other applications in the steel, aluminium, magnesium and titanium industries. The Bank will provide a loan to Ukrgrafit of USD 26 million. USD 35 million. Environmental classification and rationale Categorised B. Operations of the graphitized electrodes production are associated with a number of site specific issues, which can be readily identified, assessed and mitigated through measures as defined in the Environmental and Social Action Plan (ESAP). Due diligence completed Environmental and social due diligence (ESDD) has been undertaken by the Bank’s Environment and Sustainability Department together with the independent Consultant based on the review of all available information, including site visit, review of corporate management systems and interviews with the Company’s representatives. Key environmental issues, mitigation and summary of the ESAP Key environmental issues in graphite electrodes production are associated with air emissions (SO2, dust, CO2, metals, fluoride, VOCs, poly-aromatic hydrocarbons, etc.), solid waste and wastewater management, and land contamination. The ESDD identified several actions required to bring the Project into compliance with the Bank PRs which have been agreed with the Client in the form of an ESAP. The required actions include occupational health and safety upgrades; completion of a detailed Best Available Techniques (BAT) Assessment of the Project against Industrial Emissions Directive requirements and implementation of the resulting recommendations; and an assessment and mitigation of potential soil and groundwater legacy liabilities. The Project involves installation of the pneumatic extraction of packing material between electrodes and bag filters to minimise dust emissions and bring their levels in compliance with the EU BAT. Monitoring and reporting The Company will monitor the environmental impact of its operations in accordance with national law and regulations. The Bank will evaluate the project's compliance with the applicable environmental and social requirements during the lifetime of the project by reviewing annual environmental and social reports prepared for the project covering: (i) ongoing performance of project-specific environmental, health and safety activities as reflected in the results of periodic and quantitative sampling and measuring programmes, and (ii) the status of implementation of environmental mitigation and improvement measures. The Bank’s representatives will also conduct periodic site supervision visits when deemed appropriate. None Kutuzov Sergiy Volodymyrovych General Director Tel: +38 061 289 51 10 E-mail: kutuzov@ukrgrafit.com.ua

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data