logo
ProjectCompleted

UK's first On Track Machine fitted with ETCS

Sector: Mass Transit • Location: United Kingdom

Source: Rail Tech

Loram's new generation 'RGC' rail grinding machine, RGC01, equipped with ETCS digital signalling, completed Level 2 testing and was supplied to Network Rail to support the East Coast Digital Programme. The machine replaces an older rail-profile-treatment machine and is the first UK on-track maintenance machine with in-cab ETCS signalling.

Status
Closed
Sector
Mass Transit, Rail
Location
United Kingdom
Updated
22 Jul 2026
Source
Rail Tech

ConstructChat

Ask ConstructChat about UK's first On Track Machine fitted with ETCS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “UK's first On Track Machine fitted with ETCS” is an infrastructure initiative in the Mass Transit sector, located in United Kingdom. Taiyo aggregates data on it from Rail Tech.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Loram's new generation 'RGC' rail grinding machine, RGC01, equipped with ETCS digital signalling, completed Level 2 testing and was supplied to Network Rail to support the East Coast Digital Programme. The machine replaces an older rail-profile-treatment machine and is the first UK on-track maintenance machine with in-cab ETCS signalling.

Original sector

Railway

Location

Country

United Kingdom (UK)

Source

Source

Rail Tech

URL

More Details

Record type

Project

Sector

Mass Transit, Rail

Article published date

2026-03-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project