ULM Aircraft Fuel Systems Replacement
One of 10,000+ projects Taiyo tracks in Minnesota.
Source: Dodge
Schedule 1: Civil Site Construction & Underground Electrical Installation 2106 Excavation, Common - 3,250 CY 2106 Common Borrow (On-Site Source) - 3,125 CY 2106 Select Granular Embankment MOD 10% (CV) - 5,210 CY 2211 Aggregate Base (CV) Class 5 - 730 CY 2301 Concrete Pavement 6" - 1,415 SY 2301 Concrete Pavement 10" Reinforced - 260 SY 2360 Hot Mix Asphalt Pavement - 540 TON D-701 RCP Storm Sewer
- Status
- Closed
- Sector
- Aerospace & Defense, Water Supply and Storage, Power Generation (CCGT), Power Transmission, Road, Commercial, Raw Materials, Waste Processing and Treatment, Consumer Products, Government, Cement
- Location
- New Ulm, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about ULM Aircraft Fuel Systems Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Schedule 1: Civil Site Construction & Underground Electrical Installation 2106 Excavation, Common - 3,250 CY 2106 Common Borrow (On-Site Source) - 3,125 CY 2106 Select Granular Embankment MOD 10% (CV) - 5,210 CY 2211 Aggregate Base (CV) Class 5 - 730 CY 2301 Concrete Pavement 6" - 1,415 SY 2301 Concrete Pavement 10" Reinforced - 260 SY 2360 Hot Mix Asphalt Pavement - 540 TON D-701 RCP Storm Sewer - 90 LF D-705 4" PVC Underdrain - 1,850 LF T-901 Topsoiling, Seeding, & Mulching - 3.3 ACRES Sche... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | New Ulm |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Water Supply and Storage, Power Generation (CCGT), Power Transmission, Road, Commercial, Raw Materials, Waste Processing and Treatment, Consumer Products, Government, Cement |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Aerospace & Defense projects in United States of America
- SAT Terminal B
- Southwest Airlines BWI New Tech Ops Hangar East
- SFO United Airlines Terminal 3 Ticket Counter Redesign and Break Room Refresh
- TPA Parking Garage & Administration Building
- MDW Terminal & Concourse
- Seattle-Tacoma International Airport (SEA) International Arrivals Facility
- LAX Tom Bradley International Terminal Renovation, Apron, & Concourse Demolition
- SJC North Concourse
