Ulsan Oil Fired Power Plant Phase II Unit I
Sector: Oil and Gas • Location: South Korea
Source: Reconnecting Asia
Project
Completed
Ulsan Oil Fired Power Plant Phase II Unit I
- Status
- Closed
- Sector
- Oil and Gas, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- South Korea
- Updated
- 22 Jul 2026
- Source
- Reconnecting Asia
ConstructChat
Ask ConstructChat about Ulsan Oil Fired Power Plant Phase II Unit I
Pick a question to edit it, or write your own.
First answer free · no account
I am a
Project Information FAQ
Project Information
3 Q
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ulsan Oil Fired Power Plant Phase II Unit I |
Original sector | Powerplant |
Location
Country | South Korea |
Source
Source reliability | Medium |
Source | Reconnecting Asia |
More Details
Record type | Project |
Sector | Oil and Gas, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2023-11-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Oil and Gas projects in South Korea
- CJ Corporation Flour Mill, Yangsan City
- Hyundai Chemical MX project
- HPC Project Package-1
- Daesan II Combined Cycle Power Plant
- Pyeongtaek II Combined Cycle Power Plant Phase II
- Bugok CCGT Power Plant Phase IV (Dangjin 4) Unit-I
- Dongducheon Combined Cycle Power Plant
- Munsan Combined Cycle Power Plant Phase I Unit I
