Ultimate Urban Circulator U2C PH II Skyway Rehab
Sector: Energy Storage • Location: Jacksonville, Florida, United States of America
Source: Dodge
The primary objective of this project is to enhance connectivity and address mobility challenges within Downtown Jacksonville by modernizing the existing Skyway infrastructure and integrating advanced autonomous vehicle technologies. Project Development & Environmental (PD&E) Study to develop 30% design plans for the conversion of the existing JTA Skyway superstructure into a Connected Automated V
- Status
- Closed
- Sector
- Energy Storage, Manufacturing (Industrial), Automotive, Power Generation (CCGT), Road, Commercial, Government
- Location
- Jacksonville, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Ultimate Urban Circulator U2C PH II Skyway Rehab
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The primary objective of this project is to enhance connectivity and address mobility challenges within Downtown Jacksonville by modernizing the existing Skyway infrastructure and integrating advanced autonomous vehicle technologies. Project Development & Environmental (PD&E) Study to develop 30% design plans for the conversion of the existing JTA Skyway superstructure into a Connected Automated Vehicle (CAV) corridor, in addition to deploying a Battery Electric Bus (BEB) with route charging ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Jacksonville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Manufacturing (Industrial), Automotive, Power Generation (CCGT), Road, Commercial, Government |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 9.6 KW 24 MODULES AND 13.5 KWH ENERGY STORAGE SYSTEM N 225A LOAD CENTER
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 7.02 KW 18 MODULES AND 1 CHEM BATTERY AT 9.8KWH
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.78 KW 13.5KH ENERGY STORAGE SYSTEM
- INSTALL (16) TILTED 355W MODULES AT 5.68 KW TOTAL. INSTALL ( 1) TESLA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL TESLA SOLAR ROOF 13.92 KW 27 KWH ENERGY STORAGE SYSTEM NEW 225A DISTRIBUTION PANEL
- ROOFTOP PV SOLAR PANEL INSTALL (21) 400W MODULES AT 8.4 KW T OTAL. INSTALL (1) LG CHEM BATTERY AT 9.88 KWH CAPACITY
- ROOFTOP SOLAR PANEL INSTALL: (10) 400W MODULES AT 4.0 KW TOT AL. INSTALL (1) LG CHEM BATTERY AT 9.8 KWH CAPACITY.
