Ultra-Rapid Charging Hub in Northern Ireland
Sector: Electric Vehicles (EVs) • Location: Banbridge, Northern Ireland, United Kingdom
Source: tumirador.com.ar
Fastned has launched its first ultra-rapid charging station in Banbridge, Northern Ireland, providing up to 100 miles of range in just five minutes, powered by renewable energy. This facility enhances the region's electric vehicle infrastructure and serves as a strategic point for travelers between Belfast and Dublin.
- Status
- Closed
- Sector
- Electric Vehicles (EVs), Automotive
- Location
- Banbridge, Northern Ireland, United Kingdom
- Updated
- 22 Jul 2026
- Source
- tumirador.com.ar
ConstructChat
Ask ConstructChat about Ultra-Rapid Charging Hub in Northern Ireland
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Fastned has launched its first ultra-rapid charging station in Banbridge, Northern Ireland, providing up to 100 miles of range in just five minutes, powered by renewable energy. This facility enhances the region's electric vehicle infrastructure and serves as a strategic point for travelers between Belfast and Dublin. |
Original sector | Transportation |
Budget |
Location
Country | United Kingdom (UK) |
State | Northern Ireland |
City | Banbridge |
Source
Source | tumirador.com.ar |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Automotive |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United Kingdom
- WuXi Biologics’ Biologics Manufacturing Facility, Ireland
- Charnwood Campus’ Building 42 Research Facility Modernisation, Loughborough, UK
- Costa Coffee Roastery, Basildon, Essex, UK
- HUNTERSTON B NUCL POWER ST I
- NISSAN UK SUNDERLAND EV AND BATTERIES
- Boosting autonomous mobility at Heathrow Airport
- Hydrogen waste collection vehicles in North West Europe
- Regional strategies for sustainable and inclusive territorial development –Regional interplay and EU dialogue
