Ultra-supercritical Thermal Power Plant Boiler Package
Awarded · India · Last reported Mar 2026
Source: Rediff MoneyWiz
Thermax subsidiary Thermax Babcock & Wilcox Energy Solutions (TBWES) has secured a boiler package supply order worth approximately Rs 1,600 crore for an ultra-supercritical thermal power project in Central India. The scope includes manufacturing, supply, commissioning, and performance testing of the boiler package for a 1x800 MW plant.
- Status
- Closed
- Sector
- Geothermal, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Rediff MoneyWiz
ConstructChat
Ask ConstructChat about Ultra-supercritical Thermal Power Plant Boiler Package
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Thermax subsidiary Thermax Babcock & Wilcox Energy Solutions (TBWES) has secured a boiler package supply order worth approximately Rs 1,600 crore for an ultra-supercritical thermal power project in Central India. The scope includes manufacturing, supply, commissioning, and performance testing of the boiler package for a 1x800 MW plant. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | Rediff MoneyWiz |
URL |
More Details
Record type | Project |
Sector | Geothermal, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2026-03-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
