Ultra-supercritical Thermal Power Plant Boiler Package
Sector: Geothermal • Location: India
Source: Business Upturn
Thermax Babcock & Wilcox Energy Solutions Limited (TBWES), a subsidiary of Thermax, has secured an order to supply a boiler package for a 1x800 MW ultra-supercritical thermal power plant in Central India. The contract includes manufacturing, supply, supervision of installation, commissioning, and performance testing of the boiler package, with adherence to predefined milestones and delivery schedu
- Status
- Closed
- Sector
- Geothermal, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Business Upturn
ConstructChat
Ask ConstructChat about Ultra-supercritical Thermal Power Plant Boiler Package
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Thermax Babcock & Wilcox Energy Solutions Limited (TBWES), a subsidiary of Thermax, has secured an order to supply a boiler package for a 1x800 MW ultra-supercritical thermal power plant in Central India. The contract includes manufacturing, supply, supervision of installation, commissioning, and performance testing of the boiler package, with adherence to predefined milestones and delivery schedules. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | Business Upturn |
URL |
More Details
Record type | Project |
Sector | Geothermal, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2026-03-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
