Ultra-Supercritical Thermal Power Project Boiler Package
Sector: Power Generation (CCGT) • Location: India
Source: Machine Maker
Thermax Babcock & Wilcox Energy Solutions Limited secured a boiler package order for a 1x800 MW ultra-supercritical thermal power project. The contract includes design, engineering, manufacturing, supply, installation supervision, commissioning, and performance testing of the boiler package.
- Status
- Closed
- Sector
- Power Generation (CCGT), Geothermal, Manufacturing (Industrial)
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Machine Maker
ConstructChat
Ask ConstructChat about Ultra-Supercritical Thermal Power Project Boiler Package
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Thermax Babcock & Wilcox Energy Solutions Limited secured a boiler package order for a 1x800 MW ultra-supercritical thermal power project. The contract includes design, engineering, manufacturing, supply, installation supervision, commissioning, and performance testing of the boiler package. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | Machine Maker |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal, Manufacturing (Industrial) |
Article published date | 2026-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
