Ultraviolet (UV) Disinfection at Durham Wastewater Treatment Plant
Sector: Waste Processing and Treatment • Location: Ontario, Canada
Source: Infrastructure Canada
The project will replace the chlorine disinfection with ultraviolet (UV) disinfection rather than chlorination and de-chlorination of the treated effluent. The objective is to achieve a zero chemical discharge to the Saugeen River. The chlorine residual is currently in the order of 0.5mg/L or more whereas the guidelines restrict this level to below 0.02mg/L of total chlorine residual. The treatmen
- Status
- Closed
- Sector
- Waste Processing and Treatment, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial)
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Ultraviolet (UV) Disinfection at Durham Wastewater Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will replace the chlorine disinfection with ultraviolet (UV) disinfection rather than chlorination and de-chlorination of the treated effluent. The objective is to achieve a zero chemical discharge to the Saugeen River. The chlorine residual is currently in the order of 0.5mg/L or more whereas the guidelines restrict this level to below 0.02mg/L of total chlorine residual. The treatment plant in the existing condition is unable to comply with the provincial and federal treated effluent discharge requirements. This happens due to the chlorine residual level exceeding the guidelines limit. The chlorine residuals are undesirable due to an adverse impact on the natural aquatic environment of the receiving water body, the Saugeen River. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial) |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
