Ulu Padas Water Supply Scheme Phase 1
Sector: Power Generation (CCGT) • Location: Beaufort, Sabah, Malaysia
Source: Gamuda Berhad
Phase 1 of the Ulu Padas water supply scheme involves the construction of a 350 MLD water treatment plant in Beaufort district and 200km of water pipelines along the west coast of Sabah. The project leverages the Ulu Padas Hydroelectric project to supply renewable energy and regulate raw water flow, aiming to resolve water shortages in Sabah's main districts.
- Status
- Closed
- Sector
- Power Generation (CCGT), Water Supply and Storage
- Location
- Beaufort, Sabah, Malaysia
- Updated
- 22 Jul 2026
- Source
- Gamuda Berhad
ConstructChat
Ask ConstructChat about Ulu Padas Water Supply Scheme Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 1 of the Ulu Padas water supply scheme involves the construction of a 350 MLD water treatment plant in Beaufort district and 200km of water pipelines along the west coast of Sabah. The project leverages the Ulu Padas Hydroelectric project to supply renewable energy and regulate raw water flow, aiming to resolve water shortages in Sabah's main districts. |
Original sector | Water Supply |
Budget |
Location
Country | Malaysia |
State | Sabah |
City | Beaufort |
Source
Source | Gamuda Berhad |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Water Supply and Storage |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
