Ulug Actis
One of 906 projects Taiyo tracks in Turkiye.
Source: IFC Project Disclosures
The proposed project consists of a minority equity acquisition in Uludag Energy (the “Group”), a prominent player in the Turkish regulated power utility sector, covering Turkiye’s industrial Uludag region (). The group is composed of an electricity distribution company (“UEDAS” or the “DisCo”), a retail sales company (“UPESAS” or the “RetCo”), both owned by a services comp
- Status
- Prospective
- Sector
- Power Transmission, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Turkey
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about Ulug Actis
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed project consists of a minority equity acquisition in Uludag Energy (the “Group”), a prominent player in the Turkish regulated power utility sector, covering Turkiye’s industrial Uludag region (https://uludagenerji.com/). The group is composed of an electricity distribution company (“UEDAS” or the “DisCo”), a retail sales company (“UPESAS” or the “RetCo”), both owned by a services company (“ULUG” or the “HoldCo”). The Group has an exclusive concession covering the provinces of Bursa, Balikesir, Canakkale, and Yalova in Turkiye. UEDAS distributes electricity through low voltage lines of less than 36 kilovoltage (kV). As of end of 2024, the distribution network spans approximately 79,660 kilometer line length across the Southern Marmara region, covering an area of 35,500 square kilometers. The Group network investments aimed primarily at addressing capacity expansion requirements across UEDAS’s electricity distribution network, including new customer connections and network expansion works. The investments will be implemented across four provinces. The Group existing network has an average asset age of 25.9 years, and assessments have identified approximately 750 transformer zones with elevated capacity constraints and increased operational risk, particularly under extreme temperature conditions such as heatwaves. The Group will also upgrade the capacity for 450 transformer zones in 2026 which were assessed as a priority. For the remaining zones, operational mitigation measures will be applied which gradually be upgraded in line with eligibility for capital investment under the applicable regulatory framework. |
Original sector | V-EA - Distribution Business |
Location
Country | Turkey |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2026-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
