logo

Umari Phook Pratapur State Highway

Sector: Road • Location: India

Source: World Bank Group

Project
Active

Madhya Pradesh Road Development Corporation (MPRDC) signed a 30-year concession (including construction period of 2years) with a consortium of S&P Infrastructure Developers Private Limited and Bla Infrastructure Private Limited for the rehabilitation, strengthening, improvement, two-laning, operation and maintenance, and tolling of 43.67kms of Umari-Phook-Pratapur Road section of MDR road in the s

Project Information FAQ

Project Information

4 Q
The project “Umari Phook Pratapur State Highway” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Madhya Pradesh Road Development Corporation (MPRDC) signed a 30-year concession (including construction period of 2years) with a consortium of S&P Infrastructure Developers Private Limited and Bla Infrastructure Private Limited for the rehabilitation, strengthening, improvement, two-laning, operation and maintenance, and tolling of 43.67kms of Umari-Phook-Pratapur Road section of MDR road in the state of Madhya Pradesh. Under the contract, the consortium was responsible for the design, construction, finance, operation and maintenance,strengthening and widening the existing carriageway to 2-lane road The scope included construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections,interchanges, drains, etc.The expansion project, part of MPRDC Highway Development Project, was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. The consortium of S&P Infrastructure Developers Private Limited and Bla Infrastructure Private Limited won the tender through international competitive bidding, conducted by MPRDC, by quoting the lowest fixed annuity of US$ 2.8mn (INR 139.4mn @50 INR/USD). Under the contract, the consortium was to recover the capital costs and operating costs including returns through fixed semi-annual payment of INR 69.7mn from MPRDC as well as through tolling during the term of concession. The project attained financial closure on 21st June 2012. The debt equity ratio of the project was 69:31. The estimated capital cost of the project at the time of financial closure was US$ 14.5mn (INR 726.5mn @50 INR/USD). Financing comprised of a 15-year term loan of US$ 10mn (INR 500mn) and sponsor equity of US$ 4.5mn (INR 226.5mn). The term loan had a grace period of 1 year and a repayment schedule of 24 semi-annual installments. The debt was arranged by Allahabad Bank. Construction on the project began in June 2012 and was expected to be completed by May 2014.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data