Umred Power Transmission Project
Sector: Power Generation (CCGT) • Location: Umred, Maharashtra, India
Source: Whispers In The Corridors
The project involves the establishment of a 400/220/132 kV Substation at Umred, construction of 220 kV Double Circuit line of around 51 km from Umred (New) to Add. Buttibori (Proposed), 132 kV Double Circuit line of around 38 km from Kolari (existing) to Umred (New), and LILO of different lines at 400/220/132 kV, along with other associated works.
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- Umred, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- Whispers In The Corridors
ConstructChat
Ask ConstructChat about Umred Power Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under implementation |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the establishment of a 400/220/132 kV Substation at Umred, construction of 220 kV Double Circuit line of around 51 km from Umred (New) to Add. Buttibori (Proposed), 132 kV Double Circuit line of around 38 km from Kolari (existing) to Umred (New), and LILO of different lines at 400/220/132 kV, along with other associated works. |
Original sector | Power Transmission |
Location
Country | India |
State | Maharashtra |
City | Umred |
Source
Source | Whispers In The Corridors |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2026-03-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
