UND Starcher Hall Black Box Theater Renovation
Sector: Metal • Location: Grand Forks, North Dakota, United States of America
Source: Dodge USA
This project consists of selective demolition and remodel of approximately 6,050 SF of existing space in Starcher Hall. The project includes selective demolition, concrete, masonry, structural steel, miscellaneous steel, rough and finish carpentry, casework, Aluminum storefronts, joint sealants, hollow metal doors, overhead doors, gypsum assemblies, flooring, acoustical ceilings, painting, special
- Status
- Closed
- Sector
- Metal, Education, Steel, Cement, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Grand Forks, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about UND Starcher Hall Black Box Theater Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of selective demolition and remodel of approximately 6,050 SF of existing space in Starcher Hall. The project includes selective demolition, concrete, masonry, structural steel, miscellaneous steel, rough and finish carpentry, casework, Aluminum storefronts, joint sealants, hollow metal doors, overhead doors, gypsum assemblies, flooring, acoustical ceilings, painting, specialties, theater equipment, mechanical, and electrical Architectural services for the renovation of ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Grand Forks |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Education, Steel, Cement, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
