logo

Underground comprehensive pipe gallery in Lanshi CBD area

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

The construction entails a total of 6.86km of integrated pipe corridors and one regional sub-control center under five roads will be built, four new box-type substations, two high-pressure water mist pumping rooms and two cabins of 3-4 cabins will be built. Specifically, it includes 0.72km of T112# road (Xijinxi Road ~ Mars Street Section), 0.69km of T194# Road (Xijinxi Road - Mars Street Section)

Project Information FAQ

Project Information

5 Q
The project “Underground comprehensive pipe gallery in Lanshi CBD area” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The construction entails a total of 6.86km of integrated pipe corridors and one regional sub-control center under five roads will be built, four new box-type substations, two high-pressure water mist pumping rooms and two cabins of 3-4 cabins will be built. Specifically, it includes 0.72km of T112# road (Xijinxi Road ~ Mars Street Section), 0.69km of T194# Road (Xijinxi Road - Mars Street Section), T196# Road (Western Xixi Road - West Section of Guazhou Road) 0.234km, B123 #?(West Section of Guazhou Road, Hewanbao East Street to Dunhuang Road) 2.736km, S129# Road (Mars Street, Hewanbao East Street to Dunhuang Road) 2.48km. SPV is Lanzhou Zhengda Pipe Gallery Project Management Co., Ltd., a JV between the sponsors China Railway 21st Bureau Group Co., Ltd. (2.4%), Lanzhou Municipal Construction Group Co., Ltd. (1.6%), Gansu Yinyin Capital Management Co., Ltd. (66%) and the state-owned Lanzhou Underground Comprehensive Pipe Gallery Co., Ltd. (30%). Type of concession is BOT and contract period is 30 years. Financial close took place on March 17, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=0ec7d0bbfb0343b4b938da6a079d0456

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data