Underground comprehensive pipe gallery in Lanshi CBD area
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The construction entails a total of 6.86km of integrated pipe corridors and one regional sub-control center under five roads will be built, four new box-type substations, two high-pressure water mist pumping rooms and two cabins of 3-4 cabins will be built. Specifically, it includes 0.72km of T112# road (Xijinxi Road ~ Mars Street Section), 0.69km of T194# Road (Xijinxi Road - Mars Street Section)
- Status
- Prospective
- Sector
- Mass Transit, Water Supply and Storage, Government, Power Transmission, Rail, Road, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Gansu, China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Underground comprehensive pipe gallery in Lanshi CBD area
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The construction entails a total of 6.86km of integrated pipe corridors and one regional sub-control center under five roads will be built, four new box-type substations, two high-pressure water mist pumping rooms and two cabins of 3-4 cabins will be built. Specifically, it includes 0.72km of T112# road (Xijinxi Road ~ Mars Street Section), 0.69km of T194# Road (Xijinxi Road - Mars Street Section), T196# Road (Western Xixi Road - West Section of Guazhou Road) 0.234km, B123 #?(West Section of Guazhou Road, Hewanbao East Street to Dunhuang Road) 2.736km, S129# Road (Mars Street, Hewanbao East Street to Dunhuang Road) 2.48km. SPV is Lanzhou Zhengda Pipe Gallery Project Management Co., Ltd., a JV between the sponsors China Railway 21st Bureau Group Co., Ltd. (2.4%), Lanzhou Municipal Construction Group Co., Ltd. (1.6%), Gansu Yinyin Capital Management Co., Ltd. (66%) and the state-owned Lanzhou Underground Comprehensive Pipe Gallery Co., Ltd. (30%). Type of concession is BOT and contract period is 30 years. Financial close took place on March 17, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=0ec7d0bbfb0343b4b938da6a079d0456 |
Original sector | Water and sewerage |
Procurement method | |
Budget |
Location
Country | China |
State | Gansu |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Water Supply and Storage, Government, Power Transmission, Rail, Road, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in China
- Baluntai-Yiergen Railway
- Fujian Jiangyin International Container Terminal
- Shenzhen Metro Line 4 Phases I & II
- Tung Chung Sewage Treatment Plant and supporting infrastructure upgrade
- Guye District transportation improvement project
- Pengzhou-Bailu Railway
- Jining City Weihe Development Road project
- Luoding Railway Project
