Underground comprehensive pipe gallery in Lanshi CBD area

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

The construction entails a total of 6.86km of integrated pipe corridors and one regional sub-control center under five roads will be built, four new box-type substations, two high-pressure water mist pumping rooms and two cabins of 3-4 cabins will be built. Specifically, it includes 0.72km of T112# road (Xijinxi Road ~ Mars Street Section), 0.69km of T194# Road (Xijinxi Road - Mars Street Section)

Status
Prospective
Sector
Water Supply and Storage, Mass Transit, Commercial, Road, Waste Processing and Treatment, Rail, Power Transmission, Government, Power Generation (CCGT)
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Underground comprehensive pipe gallery in Lanshi CBD area

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Underground comprehensive pipe gallery in Lanshi CBD area” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The construction entails a total of 6.86km of integrated pipe corridors and one regional sub-control center under five roads will be built, four new box-type substations, two high-pressure water mist pumping rooms and two cabins of 3-4 cabins will be built. Specifically, it includes 0.72km of T112# road (Xijinxi Road ~ Mars Street Section), 0.69km of T194# Road (Xijinxi Road - Mars Street Section), T196# Road (Western Xixi Road - West Section of Guazhou Road) 0.234km, B123 #?(West Section of Guazhou Road, Hewanbao East Street to Dunhuang Road) 2.736km, S129# Road (Mars Street, Hewanbao East Street to Dunhuang Road) 2.48km. SPV is Lanzhou Zhengda Pipe Gallery Project Management Co., Ltd., a JV between the sponsors China Railway 21st Bureau Group Co., Ltd. (2.4%), Lanzhou Municipal Construction Group Co., Ltd. (1.6%), Gansu Yinyin Capital Management Co., Ltd. (66%) and the state-owned Lanzhou Underground Comprehensive Pipe Gallery Co., Ltd. (30%). Type of concession is BOT and contract period is 30 years. Financial close took place on March 17, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=0ec7d0bbfb0343b4b938da6a079d0456

Original sector

Water and sewerage

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Mass Transit, Commercial, Road, Waste Processing and Treatment, Rail, Power Transmission, Government, Power Generation (CCGT)

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project