logo

Underground Facility Daylighting

Sector: Commercial • Location: Regina, Saskatchewan, Canada

Source: Dodge USA

Project
Closed

In preparation for building new duct bank in downtown Regina North side of Saskatchewan Drive just East of the Canada Post building and heading West across Lorne Street to Smith Street and South on Lorne and Smith Streets as shown on the project daylight map drawings, confirmation of existing utility facilities, their locations, and their exact depths will be needed. The Work requires the removal

Status
Closed
Sector
Commercial, Car parking, Power Transmission, Road, Automotive, Tunnel, Power Generation (CCGT)
Location
Regina, Saskatchewan, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Underground Facility Daylighting

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Underground Facility Daylighting” is an infrastructure initiative in the Commercial sector, located in Regina, Saskatchewan, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In preparation for building new duct bank in downtown Regina North side of Saskatchewan Drive just East of the Canada Post building and heading West across Lorne Street to Smith Street and South on Lorne and Smith Streets as shown on the project daylight map drawings, confirmation of existing utility facilities, their locations, and their exact depths will be needed. The Work requires the removal of existing asphalt pavement/sidewalk and fill to daylight the facilities and restoration of the ...

Procurement method

Budget

Location

Country

Canada

State

Saskatchewan

City

Regina

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Car parking, Power Transmission, Road, Automotive, Tunnel, Power Generation (CCGT)

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project